The excavation company is to furnish and install the following:
- Setting of all system components.
- All 3" and 4" piping
- Backfilling (Using Caution around all pipes and risers)
- Scheduling Electrician
- Setting Risers and Covers as required
***NOTE ***
A FILTRATION MODULE WEIGHS ABOUT THE SAME AS A 1500 GALLON SEPTIC TANK, AND SHOULD BE SET BY THE DELIVERY TRUCK IF A MACHINE LARGE ENOUGH TO LIFT THESE COMPONENTS IS NOT AVAILABLE ON-SITE.